|
||||||||||
TaskTime Limit: 4000/2000 MS (Java/Others) Memory Limit: 32768/32768 K (Java/Others)Total Submission(s): 18576 Accepted Submission(s): 4798 Problem Description Today the company has m tasks to complete. The ith task need xi minutes to complete. Meanwhile, this task has a difficulty level yi. The machine whose level below this taskĄ¯s level yi cannot complete this task. If the company completes this task, they will get (500*xi+2*yi) dollars. The company has n machines. Each machine has a maximum working time and a level. If the time for the task is more than the maximum working time of the machine, the machine can not complete this task. Each machine can only complete a task one day. Each task can only be completed by one machine. The company hopes to maximize the number of the tasks which they can complete today. If there are multiple solutions, they hopes to make the money maximum. Input The input contains several test cases. The first line contains two integers N and M. N is the number of the machines.M is the number of tasks(1 < =N <= 100000,1<=M<=100000). The following N lines each contains two integers xi(0<xi<1440),yi(0=<yi<=100).xi is the maximum time the machine can work.yi is the level of the machine. The following M lines each contains two integers xi(0<xi<1440),yi(0=<yi<=100).xi is the time we need to complete the task.yi is the level of the task. Output For each test case, output two integers, the maximum number of the tasks which the company can complete today and the money they will get. Sample Input
Sample Output
Author FZU Source | ||||||||||
|