|
||||||||||
AssignmentsTime Limit: 4000/2000 MS (Java/Others) Memory Limit: 32768/32768 K (Java/Others)Total Submission(s): 2146 Accepted Submission(s): 1072 Problem Description In a factory, there are N workers to finish two types of tasks (A and B). Each type has N tasks. Each task of type A needs xi time to finish, and each task of type B needs yj time to finish, now, you, as the boss of the factory, need to make an assignment, which makes sure that every worker could get two tasks, one in type A and one in type B, and, what's more, every worker should have task to work with and every task has to be assigned. However, you need to pay extra money to workers who work over the standard working hours, according to the company's rule. The calculation method is described as follow: if someone¡¯ working hour t is more than the standard working hour T, you should pay t-T to him. As a thrifty boss, you want know the minimum total of overtime pay. Input There are multiple test cases, in each test case there are 3 lines. First line there are two positive Integers, N (N<=1000) and T (T<=1000), indicating N workers, N task-A and N task-B, standard working hour T. Each of the next two lines has N positive Integers; the first line indicates the needed time for task A1, A2¡An (Ai<=1000), and the second line is for B1, B2¡Bn (Bi<=1000). Output For each test case output the minimum Overtime wages by an integer in one line. Sample Input
Sample Output
Source | ||||||||||
|